Oracle 1Z0-1140 Certification Sample Questions and Answers

1Z0-1140 PDF, 1Z0-1140 Dumps PDF Free Download, 1Z0-1140 Latest Dumps Free PDF, Primavera Unifier Administration Professional PDF DumpsThe Oracle Primavera Unifier Administration Professional (1Z0-1140) Sample Question Set is designed to help you prepare for the Oracle Primavera Unifier Certified Administration Professional certification exam. To become familiar with the actual Oracle Certification exam environment, we suggest you try our Sample Oracle 1Z0-1140 Certification Practice Exam.

This Oracle Primavera Unifier Administration Professional certification sample practice test and sample question set are designed for evaluation purposes only. If you want to test your Oracle 1Z0-1140 knowledge to identify your areas of improvement and get familiar with the actual exam format, we suggest you prepare with the Premium Oracle Primavera Unifier Certified Administration Professional Certification Practice Exam. Our team of Oracle Construction and Engineering experts has designed Questions-Answers for this premium practice exam by collecting inputs from recently certified candidates. Our premium Oracle 1Z0-1140 certification practice exam will boost your confidence as well as your actual Oracle Primavera Unifier Administration Professional exam result.

Oracle 1Z0-1140 Sample Questions:

01. An administrator is describing why account details need to be kept current after creation.
Which reason is most relevant to administration?
a) Accounts with stale details cannot be added to further groups
b) Accounts with stale details lose their group memberships, and the permissions lapse with them
c) Work is attributed and assigned to accounts, so stale details obscure who is responsible
d) Accounts with stale details are excluded from the standard system reports
 
02. A contractor already participating in one project has been engaged on a second project as well.
What does the administrator need to arrange?
a) Permission for the contractor's users covering the second project
b) A second partner company representing the contractor on the new project
c) A shell template update carrying the contractor's participation to the project
d) A revised company relationship reflecting the contractor's wider involvement
 
03. Over several years an environment has accumulated a large number of groups, many with overlapping permissions and similar memberships.
What is the principal consequence?
a) Groups with overlapping permissions stop conferring access to their members
b) Accounts belonging to several overlapping groups lose the permissions they duplicate
c) Accounts can no longer be added to further groups once the overlap is extensive
d) Working out what any account can actually reach becomes difficult to do reliably
 
04. Users report that a change to the end-user navigation is not visible to them.
Which two possibilities should the administrator examine?
(Choose two.)
a) The users signed in before the change was deployed
b) The change was made in the end-user access mode rather than the administration mode
c) The users hold no permission on the content the change introduced
d) The revised configuration was saved but never deployed
 
05. An administrator has finished configuring a business process at company level and now wants to review how that business process behaves for a project team working inside a particular shell.
Which action moves the administrator to that view?
a) Switch the access mode, which relocates the session from the company workspace into the shell concerned
b) Navigate from the company workspace into the shell concerned, then switch to the end-user access mode
c) Navigate into the shell concerned, where the administration surface is replaced by the end-user surface
d) Assign an end-user permission to the account, which presents the shell as a project team member sees it
 
06. Two administrators disagree about whether an account that has not been used for a long period should be made inactive.
Which consideration should decide the matter?
a) Whether the account holds any outstanding assigned work
b) Whether removing it would free capacity for accounts waiting to be created
c) Whether the account currently holds permission to any project content
d) Whether the person holding it is still expected to use it\
 
07. Before moving a stalled task to someone else, an administrator wants to be sure the transfer will actually help.
Which two conditions matter?
(Choose two.)
a) The receiving participant belongs to the same partner company as the original assignee
b) The receiving participant is permitted to act on the business process concerned
c) The task is still open rather than already concluded
d) The business process has been pushed to the shell from its template
 
08. A new administrator is looking for the users, groups and templates they have been asked to maintain.
What does the company workspace hold?
a) The items awaiting the attention of the signed-in administrator
b) The configuration objects that serve the environment as a whole
c) The records raised by project teams across every active project
d) The participants belonging to a single external organization
 
09. During a handover, two company-level objects are being used interchangeably: Standards & Libraries, and shell templates.
Which statement separates them correctly?
a) A template supplies content projects draw upon, while standards supply the configuration a project is built from
b) A template is maintained per project, while standards are maintained centrally
c) A template applies to new projects, while standards apply only to projects already running
d) A template supplies the configuration a project is built from, while standards supply content projects draw upon
 
10. After a template change was propagated, some projects show the new configuration and others do not. All of them were originally created from the same template.
What should the administrator check first?
a) Which shells the propagation was actually directed at
b) Whether the affected teams hold permission on the new configuration
c) Whether the projects were created before the template was first established
d) Whether the template change was saved before it was propagated

Answers:

Question: 01

Answer: c

Question: 02

Answer: a

Question: 03

Answer: d

Question: 04

Answer: c, d

Question: 05

Answer: b

Question: 06

Answer: d

Question: 07

Answer: b, c

Question: 08

Answer: b

Question: 09

Answer: d

Question: 10

Answer: a

 

Rating: 4.8 / 5 (112 votes)